InfraScan SafeStart OS

Safety and workforce readiness for every shift

Connect worker qualifications, pre-task planning, permits and acknowledgements in one workflow, from preparation to the final work record.

Digital JHAWorker ReadinessNo-App Briefings
Illustrative interface
SafeStart OS, Shift Plan
ProjectRiverside Substation
ZoneZone A
ShiftDay · 07:00–15:00
Workers6 assigned
TaskElectrical work preparation
Hazard
Live conductors nearby
Control
Lockout / tagout, PPE
Action required Names are fictional
The Connected Work Cycle

One connected workflow before, during and after work

Keep the plan, the people and the work record connected throughout the shift.

Before Work

Prepare & approve

Prepare the plan, review worker readiness, define hazards and controls, and collect required approvals.

Shows: plan, workers, credentials, permits and acknowledgements.
During Work

Execute & see status

Follow shift status and capture workforce activity through configured workflows.

Shows: shift status, events and presence when configured.
After Work

Record & review

Complete the job, review outcomes and retain a final report with its action history.

Shows: Post-Task Review, report and audit trail.
Plan›Review Readiness›Brief›Approve›Execute›Complete›Review
Worker Readiness & Credentials

Connect worker qualifications to the work being planned

Bring worker profiles, employer details, trade, credentials and project assignments into the readiness review.

Worker profilesCredentialsProject assignmentsEligibility review
  • Qualifications and assignments reviewed in the context of the work
  • Clear reason shown when action is required
Status is shown with text and an icon, not color alone. Readiness review reflects information entered into the workflow; it is not an automated check against a government registry or issuer API.
Illustrative interface
Worker Readiness, Zone A
WorkerJ. Doe · Electrician
EmployerACME Electric
AssignmentRiverside · Zone A
Credential · ElectricalValid
Credential · Working at heightAction required
Site inductionComplete
Digital JHA & Pre-Task Planning

Build the safety plan around the actual job

Define the task, zone, hazards and controls for the shift. Keep assigned workers and required permits linked to the same plan.

  • Hazards and controls visible next to the task
  • Task → Zone → Assigned Workers kept on one plan
  • The supervisor sees what actions are still needed

JHA, Job Hazard Analysis. Hazards and controls shown are an interface illustration, not a work-safety instruction.

See a SafeStart Workflow
Illustrative interface
SafeStart Plan
TaskElectrical work preparation
ZoneZone A
Assigned6 workers
Hazard
Live conductors
Control
Lockout / tagout
Hazard
Working at height
Control
Harness & anchor
PermitElectrical · linked
Permits & Worker Acknowledgements

Link permits and briefings to work readiness

Keep required permits and worker acknowledgements connected to the plan before work is activated.

Hot WorkConfined SpaceElectricalExcavation

Permit types shown depend on the configuration proposed for your site.

Illustrative interface
Permits & Acknowledgements
Permits
ElectricalApproved
Hot WorkPending
Acknowledgements
J. DoeSigned
M. LeePending
No-App Worker Access

Brief the crew without an app download

Workers open a QR, SMS or web link, review the task, hazards and controls, and acknowledge the briefing.

No app installation is required to view a briefing. This does not remove identity, authorization or internet requirements, and a demonstration QR does not open real worker data.
Illustrative interface
Crew briefing, mobile
Step 1
Open link
QR · SMS · web
Step 2
Review briefing
Task · hazards · controls
Step 3
Acknowledge
Recorded on the plan
Shift Execution & Workforce Visibility

Keep shift status and workforce activity visible

Follow work status and review presence, zones and attendance through the workflows configured for your site.

DraftBriefingAction requiredApprovedActiveCompleted
Presence and event sources reflect configured workflows. BLE presence indicates a recent event in a zone; it is not a precise location or a measure of paid hours worked.
Illustrative interface
Shift, Zone A
Riverside · Zone AActive
09:32Shift activatedsupervisor
09:41Worker entered Zone Aevent source
10:05Acknowledgement signedweb link
10:22Last seen · Zone Apresence
Access & Time Attendance

Connect check-in, work sessions and check-out to the project

Connect check-in, work sessions and check-out records to the project.

Channels such as NFC, BLE, turnstile and manual are shown only where configured and after the connected scenario is verified. This is not a payroll integration.
Illustrative interface
Attendance, Zone A
Entry time07:02
Exit time15:04
Duration8h 02m
SourceConfigured channel
Reports & Post-Task Review

Close the shift with a complete work record

Bring the plan, workers, acknowledgements, permits and review outcomes into a final report with an audit trail.

  • Turn completed work into lessons for the next shift, new hazards, control effectiveness, near misses and follow-up actions
Report integrity verification helps detect changes at review time

Report content depends on completed data and enabled modules. Integrity verification is not blockchain, legal certification or an absolute guarantee against changes.

Illustrative interface
Compliance Report · Zone A
Project
Riverside Substation
Shift
Day · 07:00–15:00
Zone
Zone A
Workers
6
Hazards & Controls
Live conductors → Lockout / tagout · Height → Harness
Acknowledgements
6 / 6 signed
Permits
Electrical · approved
Post-Task Review
No near misses · 1 follow-up action
Procore Integration

Connect field safety records with Procore

Map projects and locations, publish completed compliance PDFs to Procore Documents, and create safety observations.

Procore
Available for pilot customers

Supported operations only. No continuous two-way sync, update or delete in this scenario. Marketplace listing and brand usage are confirmed before publication.

ProcoreProjects / Locations
SafeStartProject & zones
SafeStartCompliance PDF
ProcoreDocuments
SafeStartSafety Observation
ProcoreObservations
Procore setup guide
Autodesk Construction Cloud

Discuss your Autodesk Construction Cloud workflow

Discuss your Autodesk Construction Cloud workflow with our team.

Autodesk Construction Cloud
Scope to be confirmed
A connection does not imply synchronization of all modules. Specific user scenario and data scope are confirmed before publication.
Optional Guardian TAG & BLE

Add zone presence visibility with Guardian TAG

Extend configured workflows with Guardian TAG Card or Mini and a BLE Station network for presence detection across equipped zones.

Guardian TAGCard / Mini
BLE StationsEquipped zone
Configured gatewayor network
SafeStart OSPresence & events
Optional hardware configuration. Coverage and performance are validated for each site. A map view highlights the zone and the time of the last event; a precise position is shown only where accuracy is confirmed.
FAQ

Common questions

Do workers need an app?

Workers can access the briefing through a QR, SMS or web link without installing an app.

Can we use SafeStart without BLE hardware?

The digital planning and acknowledgement workflow can be discussed independently of the optional BLE hardware configuration.

How does SafeStart work with Procore?

The supported workflow includes project and location mapping, compliance PDF publishing and safety observation creation. Permissions and configuration apply.

Does SafeStart replace our safety team?

SafeStart supports your team's process and records. Your organization remains responsible for worksite decisions and applicable requirements.

Can we start with a pilot?

Contact our team to agree on scope, configuration and success criteria.

Get started

See SafeStart OS in your workflow

Tell us how your team prepares and manages work. We will discuss a relevant demonstration or pilot.

We use your details only to reply about your request. See our privacy policy.